Phone: +91 93537 42928
Email: info@bnsedesign.com
Opening: 11AM - 08PM

Castle Hot Springs

    Structural & Civil Engineering Services – 2018 Hospitality Development.

The Kennedy Building

The project consisted of remodeling the existing three-story historical building with approximately 6,284 SF of livable space. The existing walls are wood stud walls, conventional roof, and floor framing, and conventional concrete spread footing. Some of the upgrades done were the footings, the interior and exterior stairs, relocation of wall openings for doors and windows, and converting the crawl space into a wine cellar. Initial Project Photos:

#
#

..See more
#

Aerial Walkway

The project consisted of reviewing and overseeing the design and special structural inspection requirements for the 200ft Arial Walkway Bridge and Via Ferrata

#
#

..See more
#
#

Sky View Cabins

..See more

Casitas

The project consists of 14 individual Casitas with two models, a standard Unit and a handicap unit, both unit types are wood framing with CMU Walls at retaining conditions, the roof is a mono-slope roof system, and conventional concrete spread footings. The square footage of both units are 525sf livable, 340sf covered porch, 12sf mechanical room, 117sf outdoor hot tub patio (no roof), and 32sf mechanical unit enclosure – Total square footage 1,026sf

#

Barn & Water Tower

This project consisted of restoring the existing steel barn and a new water tower

..See more
#

Upper Hot Springs

This part of the project consisted of a cabana with access to the hot springs, and an underground water tank to store the hot spring to supply with spring water throughout the resort

..See more
#

Stone Building

This project consisted of restoring and remodeling existing stone building into a Chapel. The existing building was masonry walls and conventional spread footing. New Steel Roof and wall openings were added

#
#